99热在线免费观看_久久久久久一品道精品免费看_啊啊啊啊水好多_国产成人在线免费观看

Long auger
It can form a hole at one time, cast-in-place pile, and complete the operation of placing reinforcement cage, which has the characteristics of high efficiency, good quality and low cost
Product features

efficient

Low cost

quality

Flexible and quick

Convenient maintenance

Strong adaptability

No noise / pollution

Flexible and convenient
Applicable scenarios
Architecture
The powerful walking system makes it shuttle freely in various working conditions
bridge
With low noise and no pollution, it can completely improve the impact on the surrounding environment during the construction process
wharf
High efficiency and energy saving: large impact energy, strong penetration and strong controllability
oceanographic engineering
The impact stroke and frequency can be adjusted at will, and there is no difficulty in starting soft soil
Product description
Model selection


Main performance characteristics

- It can form a hole at one time, cast-in-place pile, and complete the operation of placing reinforcement cage, which has the characteristics of high efficiency, good quality and low cost.
- The structure of the whole machine is relatively simple, and the site positioning is flexible and fast. It is easy to operate and maintain.
- It is suitable for clayey soil, silt, fill soil and other soil. It can be used in soft soil, quicksand layer, sand gravel layer, groundwater and other complex geological conditions. There are many kinds of construction techniques, such as high pressure grouting, CFG pile construction and so on.
- It is an ideal construction equipment for pile foundation construction of industrial and civil buildings without vibration, noise and pollution.

Structural features

Power head and drilling tool
The power head is composed of double motor, three ring reducer and hanger. The motor is connected with the input shaft of the three ring reducer through the elastic coupling, and the output shaft of the three ring reducer is connected with the drilling tool through flange plate. The reducer is installed on the hanger and suspended on the column guide rail of pile frame through pulley block and steel wire rope. Driven by the winch, it can move up and down along the column guide rail to complete the drilling and piling operation.
Pile frame
The pile frame is a three fulcrum structure, and the cross shaft structure is used for the connection between the column and the fuselage. Therefore, the column adjustment is more flexible and convenient. The walking chassis is moved by walking oil cylinder and hydraulic support leg. The crawler chassis drives the crawler device through the walking motor and the traveling reducer to move the ground. The main winch and auxiliary winch are installed on the main engine. The main hoist is used to lower and lift the power head and drilling tools for pile construction, while the auxiliary hoist is used for the installation of pile frame, lifting tools and reinforcement cage.
Hydraulic system
The hydraulic system consists of oil pump motor assembly, oil tank, outrigger oil cylinder, travel oil cylinder, oil pipe, control valve, etc. It is mainly used to control the action of outrigger oil cylinder and travel oil cylinder.
control system
The control room is made of thin plate structure and three windows, which can ensure the wide view and safety and comfort. The hydraulic control is controlled by four multi-way valve handles, and the electrical control elements are arranged in the electric control console or control box, which is very convenient to operate.
Product Atlas
Long auger
It can form a hole at one time, cast-in-place pile, and complete the operation of placing reinforcement cage, which has the characteristics of high efficiency, good quality and low cost.
Service support

Service Network
Understand T-WORKS, product, reply immediately

Service Tenet
Focus on the user experience, the technical innovation lead counterparts

Inquiry
Take the customer as the center, processing transactions in a timely manner

Contact Us
Cultivate brand staff, creating brand enterprises
Contact Us
Address:Liuyang Hi-Tech Industrial Development Zone,Changsha,Hunan Province,China.
sale tel:+86-0731-83209466 83207815
After sale:+86-0731-83207816
Postcode:410323
website:www.t-works.cn
Email:info@t-works.cc
modesty sincerity
to be excellence
attention
Mobile website
changsha t-works  copyright  technical support:beisu seo